Draft prepared 9 Aug 2026. Figures marked “verify” were captured from publisher search summaries during research and must be confirmed in the source document before this page goes live. Do not publish until every row has been checked against the primary PDF or press release.
This page collects published data on what office fit-out and interior work costs, in India and internationally, with the source and date for each figure. It exists because “how much does an office fit-out cost” is one of the most-asked and worst-answered questions in commercial property, and because most of the numbers circulating online have been copied between blogs until the original source is untraceable.
Key figures at a glance
| Statistic | Figure | Geography | Period | Source |
| Average office fit-out cost, India | Approximately ₹5,847–₹6,567 per sq ft (verify) | India, major cities | 2026 | Cushman & Wakefield, Office Fit Out Cost Guide Asia Pacific 2026 |
| Office fit-out cost, Delhi | Approximately ₹6,207 per sq ft (verify) | Delhi | 2026 | Cushman & Wakefield, Office Fit Out Cost Guide Asia Pacific 2026 |
| Office fit-out cost in USD terms | Approximately USD 65–73 per sq ft nationally; Delhi NCR approximately USD 65–69 (verify) | India | 2026 | Cushman & Wakefield, reported March 2026 |
| Cities and countries covered by the leading APAC fit-out benchmark | 27 cities across 14 countries | Asia Pacific | Published 6 May 2026 | JLL, Asia Pacific Office Fit-Out Cost Guide 2026 |
| Year-on-year movement in fit-out costs | Roughly 2–6% increase across regions (verify) | Global | 2026 | JLL, Asia Pacific Office Fit-Out Cost Guide 2026 |
| Global average office fit-out cost | Approximately USD 147 per sq ft (verify) | Global | 2026 | Reported from the 2026 APAC fit-out cost guides |
Why India’s fit-out costs sit at the low end of Asia Pacific
India is consistently reported as one of the most cost-efficient fit-out markets in the Asia Pacific region. The gap between an Indian fit-out rate and the global average is large — on the figures above, an Indian office costs roughly half the global average per square foot to fit out. The drivers are labour cost, domestic availability of most finishing materials, and a well-developed local contracting base. The gap narrows considerably on projects specifying imported stone, imported joinery hardware, high-end AV or advanced building services, because those components are priced internationally.
This matters commercially: a fit-out budget benchmarked against a global parent company’s numbers will usually be significantly overstated for an Indian project, and a budget benchmarked against the cheapest local quote will usually be significantly understated for international-standard specification.
The market context: why fit-out demand is where it is
| Statistic | Figure | Period | Source |
| India office leasing, annual | A record 82.6 million sq ft — the third consecutive record year | 2025 | CBRE India, press release and India Office Figures Q4 2025, 5–6 January 2026 |
| New office supply | A new peak of 58.9 million sq ft | 2025 | CBRE India, January 2026 |
| Net absorption | A record 57.0 million sq ft, up 14.1% year on year | 2025 | JLL India, 15 January 2026 |
| Quarterly absorption | 22.2 million sq ft | Q4 2025 | CBRE India, India Market Monitor Q4 2025 |
| Net absorption, first half | 26.9 million sq ft (verify) | H1 2026 | JLL India, 14 July 2026 |
| Global capability centre leasing | A record of approximately 31 million sq ft (verify) | 2025 | CBRE India |
| Delhi-NCR flexible workspace leasing | Rose from 0.3 million sq ft in Q2 2025 to 1.6 million sq ft (verify) | Q2 2025 to Q2 2026 | CBRE, reported via ET Realty, 7 July 2026 |
| India retail leasing | 8.9 million sq ft (verify) | 2025 | CBRE India |
Every square foot leased eventually becomes a square foot fitted out. Record leasing volumes are, with a lag of roughly two to four quarters, record fit-out volumes — which is why contractor capacity and material lead times tighten in the year following a strong leasing year, and why fit-out programmes quoted during a boom should carry more schedule contingency than the same job quoted in a slow year.
What a per-square-foot fit-out rate does and does not include
Published benchmarks are not directly comparable to a contractor’s quotation unless the inclusions match. Consultancy fit-out guides typically grade projects on a ladder from basic through collaborative to advanced specification, and typically price on the basis of a defined scope. Before comparing any two numbers, establish for each of them whether it includes: loose furniture; audio-visual and IT equipment; the base-build services the landlord has already provided; professional and project management fees; taxes; and contingency. Two rates that differ by 40% frequently differ only in what they include.
Sustainability and green building context
| Projects registered with the Indian Green Building Council | More than 19,820, with a green footprint of over 16.20 billion sq ft; more than 8,100 certified and fully operational; 33 rating systems | Current, 2026 | Indian Green Building Council (igbc.in) |
India holds the second-largest registered green building footprint in the world on IGBC’s figures. For interiors specifically, this translates into rising client expectations around low-VOC materials, energy-efficient lighting and controls, water fixtures, and documented waste management on site — all of which have a cost implication that is rarely separated out in headline fit-out benchmarks.
Workplace effectiveness: what the spending is meant to achieve
| Employees qualifying as regular AI users at work | 30% (verify) | Global | Gensler Research Institute, Global Workplace Survey 2026, 10 March 2026 |
| Workers who felt a recent office update improved things | Approximately 21% (verify) | Global | Gensler Research Institute, Global Workplace Survey 2025 |
The second figure is the one worth dwelling on. If only about a fifth of employees who experienced an office refresh felt it made things better, then most fit-out capital is being spent without achieving its stated purpose. That is an argument for spending differently — on acoustics, on the right mix of focus and collaboration space, on lighting and air quality — rather than for spending more.
What is missing from the public data
There is no publicly maintained, methodologically transparent index of Indian interior fit-out rates at trade level in rupees. The consultancy guides are annual, national or city-average, and generally require registration. Nothing published tracks what carpentry, false ceiling, flooring, painting or electrical work actually costs per unit in Delhi NCR, or how those rates move quarter to quarter. [INTERNAL NOTE: this gap is what /research/delhi-ncr-interior-cost-index/ is designed to fill. Link to it here once published.]